Skip to Content
  • English (US) Magyar
  • +36 70 4646 336 | +36 70 4646 336 | +36 70 4646 334 | info@tomkostagece.eu
  • 0
    My Cart
  • 0
    Wishlist
  • Sign in
  • Home
  • Mobile stage
  • Stage roofs & gates
  • Case studies
  • Pricing
  • Shop
  • Contact
  • Technical data ⚙ Stage configurator Get a quote within 1 business day!
  • 0
  • 0
    • Home
    • Mobile stage
    • Stage roofs & gates
    • Case studies
    • Pricing
    • Shop
    • Contact
  • +36 70 4646 336 | +36 70 4646 336 | +36 70 4646 334 | info@tomkostagece.eu
  • English (US) Magyar
  • Sign in
  • Technical data ⚙ Stage configurator Get a quote within 1 business day!

Mobile stage and stage roof at the University of Miskolc

  1. Stage technology case studies
  2. Mobile stage and stage roof at the University of Miskolc
March 29, 2026 by
Mobile stage and stage roof at the University of Miskolc
01 09 446375, Sarbó Gergely

This case study presents the project carried out during the renovation of the canteen of the University of Miskolc and its surroundings, where we supplied professional stage technology on behalf of PEKA BAU 2000 Kft..

Case study: University of Miskolc canteen – professional event technology infrastructure

1. Project background and objectives

During the renovation of the central canteen of the University of Miskolc and its surroundings, raising the standard of university life required a professional stage system that is permanently available yet flexible to use. The general contractor PEKA BAU 2000 Kft. was looking for a durable, safe solution that can be installed quickly for various university events.

2. The task and the equipment supplied

In the project the Tomkostage TS3 stage system and matching TAF aluminium roofs were chosen. The order consisted of the following main units:

  • Two large stage roofs: at the customer’s special request, the 12x10 m and 10x8 m roofs were supplied in a motorised (motorised sleeve block) version, which makes operation much easier and faster.

  • Three mobile stages: as part of the project we delivered Tomkostage TS3 stage systems of various sizes (e.g. 4x3 m, 6x4.5 m), which are easy to reconfigure thanks to their modular design.

3. Technical challenges and solutions

  • Special anchoring: due to the site conditions (paving, no anchoring points) we paid special attention to safe ballasting. Where there were no anchoring points, we ensured the stability of the structures with 1000-litre IBC tanks in accordance with the static requirements.

  • Tight deadline: the installation fell in the peak event season (May). One of the biggest advantages of the Tomkostage TS3 system is its extra fast assembly (one person can easily move the 31 kg elements), which allowed us to complete the whole system – both roofs and the stages – within a single working week.

  • Load capacity: the 1500 kg/m² load capacity of the TS3 elements and TÜV certification guarantee that the system remains safe even during the most intense university concerts and events.

4. Results and experience

In close cooperation with PEKA Bau we not only delivered the equipment but also held on-site training for the university’s operations team so they can confidently handle the systems in the future. As a result, the University of Miskolc gained a modern, lasting equipment park that will serve institutional events for many years.

Get a quote within 1 business day!

From the design to the indoor grandstand
Theatre technology innovation in Salgótarján with the Zenthe Ferenc Theatre

Products


  • Mobile stage systems
  • Truss structures
  • Gates with sleeve blocks
  • Fixed-leg stage roofs
  • Stage roofs with sleeve blocks

 All products

Customer Care


  • General Terms and Conditions
  • Privacy notice
  • Cookie policy
  • Withdraw from contract
  • Contact us

Certain cookies are essential for our site to work properly. We also use cookies for statistics and marketing measurement; these are only loaded in your browser if you click the button to accept cookies. You can find more information about cookies in the related privacy notice.

Only essentials I agree